Caltech Central Plant Cooling Tower Replacement

Project Description

Replacement of cooling towers and pumps for the existing physical plant. Project included installation of six cooling towers and eight pumps, associated piping, variable frequency drives, and PLC-based controls system.

GENERAL CONTRACTOR
Layton/Abbott
Mechanical Engineer
Affiliated Engineers
Contract Amount
$5.4M

Share:
Image
Image
Image