Project Description
PPC constructed a new central plant building that contains the cooling and heating equipment, electrical, and control systems. An adjacent open yard contains the cooling tower, make-up water and filtration systems. Chilled and heating hot water is provided to the campus through an underground and above-ground distribution system. The cooling equipment consisted of (2) 600-ton chillers, primary and secondary pumping systems and a TES tank. The heating equipment consists of (6) high-efficiency hot water boilers and primary variable flow pumping systems.
PROJECT TYPE
GENERAL CONTRACTOR
Plumbing, Piping, and Construction, Inc.
Mechanical Engineer
P2S Engineering
Contract Amount
$6.8 million
Unique Features
The project took place while the College was in session, minimal disruption to the students and the faculty was of key importance.