Pomona Valley Hospital Outpatient Pavilion

Project Description

The construction of this new three story, 55,000 square-foot, Outpatient Pavilion included five outpatient surgery suites, twenty preparatory and recovery beds, state-of-the-art physical therapy facilities, and administrative support for the hospital.  The mechanical portion of the project included (5) air handlers with VFDs, (15) A/C split systems, clean suite surgical systems, supply and return boxes, exhaust systems, duct work, controls, (3) hot water boilers, steam boiler, pumps, expansion tank, air separator, chilled and hot water piping, medical gas piping and equipment and condensate piping. This project is LEED Silver certified.

GENERAL CONTRACTOR
gkkworks
Mechanical Engineer
Glumac
Contract Amount
$6 million
Completion
March 2015
Architect
gkkworks
Unique Features
To ensure that we met the aggressive construction schedule, substantial labor resources were dedicated in a condensed timeframe.