PPC constructed a new central plant utilizing space in and around the existing Parking Structure “A”.  The mechanical portion consisted of the installation of (2) 1,250-ton water-cooled chillers, (3) cooling towers, chilled water pumps, condenser water pumps, air handler units, central plant pipe valves and fittings with VFDs, distribution piping,  and mechanical exhaust system.  The Plumbing portion of the project included the addition of floor sinks, floor drains, waste, vent, and water.  

Mechanical Engineer
P2S Engineering
Contract Amount
$7.8 million
Completion
February 2014